A new bulk system is to be installed.In compliance with NFPA 70 the new wiring is being run installed underground from initiating device to a junction box located where the wiring first enters the building. NFPA 99 permits what minimum number of sets of wire to connecting the initiating device with a junction box for each signal?A) 1B) 2C) 3D) 4
B) 2
A non document in which the main text contains only mandatory provisions. Non-mandatory provisions are located in the appendix or the Annex. This is that NFPA 99 definition for which of the following?A) code.B) guide.C) reference.D) standard.
D) It is the standardA patient care room is any room of health care faculty where in patients are being intended to be?A) either admitted or dischargedB) Examined or treatedC) interviewedD) sent for x-rays
A wireless communication device is employed in a medical gas or vacuum warning system. what type of supervision is required for this device?A) a visual indicator Shelby located in maintenance officer or engineering department.B) this device shall be installed at the medical gas or vacuum source.C) this device shall be located at nurses station.D) this device will be supervised such that failure communication shall initiate an alarm.
D) This device will be supervised such that failure of communication shall initate an alarm
After completion of all installer perform tests which of the following methods shall be used to determine that no cross connection exist?A) individual pressurization.B) pressure differential.C) both A&B.D) either A or B.
D) either A or B. It is either individual pressurization or pressure differential
An existing system that is not in strict compliance with the provisions of this standard shall be permitted to continued in use as long as what following conditions are met?A) the A.H.J. has determined that such does not constitute a distinct health of life.B) the chief administrator of the Faculty has determined that such use does not consist distinct hazard of life.C) the proper notice is posted.D) such a system shall not be permitted to continue in use.
A) The authority having jurisdiction has determine that such use does not constitute a distinct hazard to life
ASSE 6000 annex J provides "recommended guidelines for conducting planned medical gas system shutdown and temporary backfeed" annex j. guidelines do not include a list of responsibilities for what type of workers?A) installers. B) Medical Gas generalist. C) shutdown coordinator. D) verifier.
B) Medical Gas generalist
Compressed gas cylinders must What following criteria in order to be acceptable for use in acute Healthcare faculty?A) be appropriately color coded in accordance with U. S. D. A.B) be appropriately identified by attach labels or stencils in accordance with CGA C-7 criteria. C) be constructed in accordance with the specifications and regulations of OSHA. D) utilized a specific C. G. A. Connections.
B) Be approximately identified by attached labels or stencils in accordance with CGA C - 7
Excluding outdoor locations
which of these is an NFPA 99 requirement for wiring of each of two mandatory master alarms?A) alarms shall be sent to the area alarm panel in the emergency roomB) common conductorsC) Wired independently to the initiating device for each signalD) with out any splices
If nonmetallic flexible connectors is being used in a category 1 healthcare faculty to connect to the manifold to the gas distribution piping what is the maximum length permitted for the flexible connectors?A) 2.5 feetB) 5 feetC) They shall be no longer necessaryD) the use of flexible connectors is not permitted.
C) They shall be no longer necessary
Metallic flexible joints are being used in the pipeline for vibration control. What is NOT
required for such a joints?A) able tho withstand 1000 degreesB) provide brazing extensions to allow brazing in to the pipe line.C) received on the job site with certification of cleanliness orD) Suitable for service at 150
Riser valves are those valves located where?A) adjacent to the main riser downstream of any zone valve.B) anywhere in the lateral branches of the piping system.C) in the mainline adjacent to the base of the riser.D) in the riser adjacent to the mainline.
D) In the riser adjacent to the main line
The removal of components within a source system for repair and reinstallation or for replacement shall be treated as new work for the purpose of testing whenever such work involves which of the following? A) air quality monitoring. B) calibration of alarm systems. C) cutting and/or brazing new pipe. D) system control systems.
C) Cutting and/or brazing new piping
The standing pressure test for positive pressure medical gas piping shall be conducted with the source valve closed and the vacuum system subjected to which test time and pressure? A) 8 hours at 150 psi. B) 8 hours at 20% above operating pressure.C) 24 hours at 150 psi. D) 24 hours at 20% above normal operating pressure.
D) 24 hours at 20% above normal operating pressure
The tool shown here allows the installer to mechanically limit the makeup depth of the fitting to be brazed. Under what condition is this method permitted for the installation of medical gas piping?A) only on final line connectors.B) only on vacuum systems.C) where only B cup 5 brazing rod is usedD) where the limited makeup depth is not less than minimum cut depth her ANSI / ASME recommendations
D) Where the limited makeup depth is not less than minimum cup depth current ANSI\ASME recommendation
Under which of these conditions shall the instrument Air Reserve header cylinders be permitted to be stored with the instrument air compressor?A) the mechanical equipment room does not contain a boiler. B) the medical air compressors are in the same room.C) the only motor-driven machinery in the room is for instrument air equipment.D) the room is secured with lockable doors.
C) The only motor-driven machinery in the room is for the instrument air equipment
Vacuum piping for What shall be connected separately from the medical surgical system directly to the receiver tank through its own isolation valve in fluid trap located at the receiver?A) a location required seismic restraint.B) a teaching laboratory.C) each W.A.G.D. system.D) the standing vacuum test.
C) Each wagd system
What is the purpose of using A oxygen analyzer the pipeline purged prior to breathing? A) assure that ambient air has been removed from the pipeline. B) maintain a nitrogen atmosphere at least 95% with the piping system. C) provide continuous monitoring during the verification test. D) reduce the oxygen concentration below 5% or brazing.
A) To ensure that all ambient air has been removed from the pipeline
Where medical gas systems operate at pressures other than the standard gauge pressures
what is required to be listed on the stations outlet identification?A) guest registration number and a toll free number to call information.B) name of gas.C) non standard operating pressure.D) both B&C.
Which of the following conditions must be met or medical gas and vacuum systems are installed by non-certified personnel?A) uninstaller certified to ASSE 6010 must be present to oversee the installation work.B) an inspector certified to ASSE 6020 is present on the job site to inspect the installation installers work.C) the installer must be an employee of an authorized medical gas contractor and only while uninstaller certified to ASSE 6010 oversees the installation work.D) The installation by any other than 6010 certified personnel is not permitted.
D) The installation by any other than 6010 certified personnel is not permitted.
Which of the following is requirement for configuration of zone valve boxes?A) located in the room it serves.B) locked so that the valves are inaccessible to the public.C) placed such that wall intervenes between the valves and the inlets / outlets they control. D) serves inlet / outlets located on two or more floors.
C) Placed such that wall intervenes between the valve and inlet / outlets they control
Who shall witness the installer perform both standing pressure test and standing vacuum test?A) installation contractor superintendent.B) Medical Gas verifierC) The authority having jurisdiction or its designeeD) a witness is not required
C) The authority having jurisdiction or its designee
Wooden rack for cylinder storage may be permitted under which conditions?A) the wooden must be painted.B) they are permitted with no set conditions .C) they must be located in an area with fire suppression system.D) Wooden racks are no longer permitted
D) Wooden racks are no longer permitted
A new bulk system is to be installed.In compliance with NFPA 70 the new wiring is being run installed underground from initiating device to a junction box located where the wiring first enters the building. NFPA 99 permits what minimum number of sets of wire to connecting the initiating device with a junction box for each signal?A) 1B) 2C) 3D) 4
B) 2
A non document in which the main text contains only mandatory provisions. Non-mandatory provisions are located in the appendix or the Annex. This is that NFPA 99 definition for which of the following?A) code.B) guide.C) reference.D) standard.
D) It is the standardA patient care room is any room of health care faculty where in patients are being intended to be?A) either admitted or dischargedB) Examined or treatedC) interviewedD) sent for x-rays
A wireless communication device is employed in a medical gas or vacuum warning system. what type of supervision is required for this device?A) a visual indicator Shelby located in maintenance officer or engineering department.B) this device shall be installed at the medical gas or vacuum source.C) this device shall be located at nurses station.D) this device will be supervised such that failure communication shall initiate an alarm.
D) This device will be supervised such that failure of communication shall initate an alarm
After completion of all installer perform tests which of the following methods shall be used to determine that no cross connection exist?A) individual pressurization.B) pressure differential.C) both A&B.D) either A or B.
D) either A or B. It is either individual pressurization or pressure differential
An existing system that is not in strict compliance with the provisions of this standard shall be permitted to continued in use as long as what following conditions are met?A) the A.H.J. has determined that such does not constitute a distinct health of life.B) the chief administrator of the Faculty has determined that such use does not consist distinct hazard of life.C) the proper notice is posted.D) such a system shall not be permitted to continue in use.
A) The authority having jurisdiction has determine that such use does not constitute a distinct hazard to life
ASSE 6000 annex J provides "recommended guidelines for conducting planned medical gas system shutdown and temporary backfeed" annex j. guidelines do not include a list of responsibilities for what type of workers?A) installers. B) Medical Gas generalist. C) shutdown coordinator. D) verifier.
B) Medical Gas generalist
Compressed gas cylinders must What following criteria in order to be acceptable for use in acute Healthcare faculty?A) be appropriately color coded in accordance with U. S. D. A.B) be appropriately identified by attach labels or stencils in accordance with CGA C-7 criteria. C) be constructed in accordance with the specifications and regulations of OSHA. D) utilized a specific C. G. A. Connections.
B) Be approximately identified by attached labels or stencils in accordance with CGA C - 7
Excluding outdoor locations
which of these is an NFPA 99 requirement for wiring of each of two mandatory master alarms?A) alarms shall be sent to the area alarm panel in the emergency roomB) common conductorsC) Wired independently to the initiating device for each signalD) with out any splices
If nonmetallic flexible connectors is being used in a category 1 healthcare faculty to connect to the manifold to the gas distribution piping what is the maximum length permitted for the flexible connectors?A) 2.5 feetB) 5 feetC) They shall be no longer necessaryD) the use of flexible connectors is not permitted.
C) They shall be no longer necessary
Metallic flexible joints are being used in the pipeline for vibration control. What is NOT
required for such a joints?A) able tho withstand 1000 degreesB) provide brazing extensions to allow brazing in to the pipe line.C) received on the job site with certification of cleanliness orD) Suitable for service at 150
Riser valves are those valves located where?A) adjacent to the main riser downstream of any zone valve.B) anywhere in the lateral branches of the piping system.C) in the mainline adjacent to the base of the riser.D) in the riser adjacent to the mainline.
D) In the riser adjacent to the main line
The removal of components within a source system for repair and reinstallation or for replacement shall be treated as new work for the purpose of testing whenever such work involves which of the following? A) air quality monitoring. B) calibration of alarm systems. C) cutting and/or brazing new pipe. D) system control systems.
C) Cutting and/or brazing new piping
The standing pressure test for positive pressure medical gas piping shall be conducted with the source valve closed and the vacuum system subjected to which test time and pressure? A) 8 hours at 150 psi. B) 8 hours at 20% above operating pressure.C) 24 hours at 150 psi. D) 24 hours at 20% above normal operating pressure.
D) 24 hours at 20% above normal operating pressure
The tool shown here allows the installer to mechanically limit the makeup depth of the fitting to be brazed. Under what condition is this method permitted for the installation of medical gas piping?A) only on final line connectors.B) only on vacuum systems.C) where only B cup 5 brazing rod is usedD) where the limited makeup depth is not less than minimum cut depth her ANSI / ASME recommendations
D) Where the limited makeup depth is not less than minimum cup depth current ANSI\ASME recommendation
Under which of these conditions shall the instrument Air Reserve header cylinders be permitted to be stored with the instrument air compressor?A) the mechanical equipment room does not contain a boiler. B) the medical air compressors are in the same room.C) the only motor-driven machinery in the room is for instrument air equipment.D) the room is secured with lockable doors.
C) The only motor-driven machinery in the room is for the instrument air equipment
Vacuum piping for What shall be connected separately from the medical surgical system directly to the receiver tank through its own isolation valve in fluid trap located at the receiver?A) a location required seismic restraint.B) a teaching laboratory.C) each W.A.G.D. system.D) the standing vacuum test.
C) Each wagd system
What is the purpose of using A oxygen analyzer the pipeline purged prior to breathing? A) assure that ambient air has been removed from the pipeline. B) maintain a nitrogen atmosphere at least 95% with the piping system. C) provide continuous monitoring during the verification test. D) reduce the oxygen concentration below 5% or brazing.
A) To ensure that all ambient air has been removed from the pipeline
Where medical gas systems operate at pressures other than the standard gauge pressures
what is required to be listed on the stations outlet identification?A) guest registration number and a toll free number to call information.B) name of gas.C) non standard operating pressure.D) both B&C.
Which of the following conditions must be met or medical gas and vacuum systems are installed by non-certified personnel?A) uninstaller certified to ASSE 6010 must be present to oversee the installation work.B) an inspector certified to ASSE 6020 is present on the job site to inspect the installation installers work.C) the installer must be an employee of an authorized medical gas contractor and only while uninstaller certified to ASSE 6010 oversees the installation work.D) The installation by any other than 6010 certified personnel is not permitted.
D) The installation by any other than 6010 certified personnel is not permitted.
Which of the following is requirement for configuration of zone valve boxes?A) located in the room it serves.B) locked so that the valves are inaccessible to the public.C) placed such that wall intervenes between the valves and the inlets / outlets they control. D) serves inlet / outlets located on two or more floors.
C) Placed such that wall intervenes between the valve and inlet / outlets they control
Who shall witness the installer perform both standing pressure test and standing vacuum test?A) installation contractor superintendent.B) Medical Gas verifierC) The authority having jurisdiction or its designeeD) a witness is not required
C) The authority having jurisdiction or its designee
Wooden rack for cylinder storage may be permitted under which conditions?A) the wooden must be painted.B) they are permitted with no set conditions .C) they must be located in an area with fire suppression system.D) Wooden racks are no longer permitted
D) Wooden racks are no longer permitted